Chief Operating Officer, sitem-insel AG
challenges
Due to its research character, the new building should offer as many options as possible for later conversion and expansion. This increases the complexity of the planning. During the ongoing project, the team had to react flexibly to changing framework conditions, for example by revising standards and regulations or adapting the use of the building. Fire protection was also affected. The building's architecture focuses on a transparent and light-flooded design. Under these conditions, it was a particular challenge to integrate the technical requirements into the overall concept in the best possible way.
SOLUTIONS
The experience of the entire team is crucial to the success of the project. Both in the area of laboratory ventilation and in the area of the thermal energy balance (heating/cooling) of the sophisticated glass façade construction, we relied on a proven team that had already successfully solved similar tasks. With the help of BIM, we were able to model the various options for the subsequent conversion and extension. We were nominated for the Swiss BuildIng Award 2021 in the Best-in-Class Building Technology category for the project.