The existing hospital pharmacy space had to remain largely in operation while project work was going on, because supplies for the cantonal hospital can only be secured via this building.
Therefore, extensive temporary arrangements had to be made.
An independent air-conditioning system was designed for the
manufacturing and storage area so that the handling of cytostatic and highly toxic substances is adequately taken care of.
Therefore, extensive temporary arrangements had to be made.
An independent air-conditioning system was designed for the
manufacturing and storage area so that the handling of cytostatic and highly toxic substances is adequately taken care of.