BIM2FM offers the greatest leverage for optimisations and energy efficiency in operation. 

With the use of BIM models in facility management we help our customers to reduce their running costs and to open up new opportunities in the life cycle of a building.

The operational phase of a building is the longest phase of its life cycle. The costs for the use of buildings are correspondingly high compared to the construction costs. Here lies the greatest leverage for economic success. The basis for this are the BIM data from the construction phase. As engineers, we build the bridge between construction and operation and ensure that the models are used in facility management and stored with the right information. With BIM2FM, we ensure economical building operation and optimal facility management.
Optimising planning
Thanks to the open system code of the BIM software, actuators, sensors and the building management system can be integrated into the entire BIM concept right from the start. The digital building model thus becomes the real-time based control, measurement and regulation centre.
Simulations
With BIM models, important parameters of a building can be defined in advance. Variables such as indoor climate and CO2 emissions can be calculated and optimised.
Services
Project management  
Together with you, we’ll coordinate the BIM client specifications and ensure that all the necessary information for operation is available in the model.
User centricity   
Use cases are the basis for the subsequent operation; in workshops, we define and describe the use cases and derive the necessary BIM specifications.
Application architecture
 In order for the digital twin to be used, there needs to be an embedded application architecture. The optimal architecture is developed in coordination with the IT department and technology.
Interface definition
Based on the application architecture, the different interfaces are defined between CDE, CAFM, ERP, the building management system and all other systems.
System evaluation
Replace systems, introduce new systems: For system evaluation we draw up the specifications, send out invitations to tender and monitor the integration.
ICT integration
The merging of IT and OT is mandatory: As bridge builders between IT and technology, we work out the necessary integration of the systems step by step.
Technology scouting
Always one step ahead: We observe rapidly changing technologies, new opportunities and megatrends through targeted market analyses and use these findings for the best system decisions. 
"As engineers with HKLSEGA and BIM background we bridge the gap between construction and operation. We ensure that the models created are used in facility management and filled with the right information."
Adrian Staudenmaier
Digital Building Leader
Next Technology
As engineers with HKLSEGA and BIM background we bridge the gap between construction and operation. We ensure that the models created are used in facility management and filled with the right information.
Adrian Staudenmaier
Digital Building Leader